|
|
|
|
|
|
|
|||
-
India plans to construct being a worthy opponent Chinas Tibet railway networks wartime traffic line
Posted on 十月 13th, 2009 No commentsThe Hindustan Times on October 8 published named “India Step China Footsteps To want To build the Rail connection Frontier Along the route” article. The article thinks that the Indian aspect compared to Russ Bull who plans to construct Maneri – arranges in order city the railroad will be will resist China to construct the railway network in the Tibet boundary, will obtain the strategic advantage one countermeasure. This railroad will become the eastern boundary Indian armed forces to provide the military equipment the effective support.
According to the Prime Minister of India Manmohan Singh’s suggestion, the Indian railway company has completed its ambitiously, is 497 kilometers compared to Russ Bull Maneri – arranges in order city the earlier investigation of railroad, this railroad from Himachal Pradesh will extend to India-controlled Kashmir. Are located at Himachal Pradesh compared to Russ Bull and Maneri, but arranges in order the city is located at India-controlled Kashmir’s Ladake capital.
The article said that constructs this bar iron route regards as in the Indian home is one kind eliminates China in the China, India frontier strategic advantage countermeasure. Before then, China has constructed to complete one has been 3900 kilometers Beijing to the Lhasa track line, and is impelling to construct other 7 to adjoin to the Indian boundary’s railway project. Reported from Beijing’s news, China announced the plan this rail connection to it and Burmese boundary connected Ruili (Ruil) gate house. Over the next three years, China proposed the construction total length 5000 kilometers plateau track line plan, the key point is to connect the Tibet Autonomous Region each region. At the same time, China also proposed in Nepal constructs a railway network.
Facing the Chinese aggressive strategy, the Indian aspect will try to guarantee the construction of this railroad. The Indian railway company in last week suggestion of submission, publicized to demonstrate to the outside compared to Russ Bull Maneri – arranges in order city track line is 10 years construction timetable, always spent the estimate to reach 2.25 trillion rupees (approximately 4.5 billion US dollars). The earlier investigation of this railroad started in March. However, because the condition is bad, this investigation project has carried on merely for 5 months, its investigation expense has spent 7.2 million rupees (144,000 US dollars). In order to solve the possible financial problem, is not willing to disclose that the name high-ranking official said that the government in last February, the premier’s office (PMO) transmitted to them carries on this investigation the statistical reference. This railway company will propose the survey result to premier’s office, and seeks the country project plan fund for this project the support.
The Indian force high level has authorized to construct this railway project the report. Simla army training Headquarters’ general Commander Lan Ba (A.S.Lamba) will say in October 2 to the media: Compared to Russ Bull Maneri – arranges in order the city track line in the wartime, another traffic line which will become the eastern boundary fight to provide weaponry important may choose. Because before again this, Indian Army chief of the general staff Kappel (DeepakKapoor) said that the military also passes has specially constructed to lead to the Indian east frontier all-weather railroad plan. (History abundant/falls splendor)
(This article originates: Link net. More splendid, please click on link net http://www.huanqiu.com/)

Leave a reply