gtrip
又一个 WordPress 博客
-
The Shenyang subway Line 1 entire line hole passes (1) (figure)
Posted on 十二月 29th, 2009 No comments
New China net, Shenyang, on December 11, 2009 On December 11, completed in the last section of tunneling project, the constructor took a group souvenir photo.On the same day, Shenyang subway Line 1 28 kilometers realize the entire line hole to pass. Shenyang subway Line 1 issue and the western extended line project, the western Shenyang economic development zone No. 13 street, the east to the daybreak square, altogether supposes station 22. At present, the Shenyang subway construction winter intense was still constructing, it is estimated that at the end of October, 2010 realizes the trial operation.
Xinhua News Agency Reporter Li Gangshe
(This article originates: New China net)

Leave a reply