The Shenyang subway Line 1 entire line hole passes (2) (figure) @ gtrip
gtrip
RSS icon Email icon
  • The Shenyang subway Line 1 entire line hole passes (2) (figure)

    Posted on 十二月 29th, 2009 znnw No comments
    Shenyang subway Line 1 line entire line hole passes (2) (figure)

    New China net, Shenyang, on December 11, 2009

      

      This was the Shenyang subway Line 1’s last section of tunneling project scene (on December 11 absorbs).

      On December 11, the Shenyang subway Line 1 28 kilometers realized the entire line hole to pass. Shenyang subway Line 1 issue and the western extended line project, the western Shenyang economic development zone No. 13 street, the east to the daybreak square, altogether supposes station 22. At present, the Shenyang subway construction winter intense was still constructing, it is estimated that at the end of October, 2010 realizes the trial operation.

      Xinhua News Agency Reporter Li Gangshe

    (This article originates: New China net) netease

    Leave a reply